警告
You are reading an old version of this documentation. If you want up-to-date information, please have a look at 5.1 .Power supply
Power connection
Plug in the provided power cable to the EYE+ Controller power input and to the specified power supply (see 表 11).
Once it is done, the EYE+ Controller will start automatically. On system startup, the status LED is off. It can take 2 minutes to start. This could take longer in case of restart after upgrade (around 5 minutes).
注釈
The system will automatically reset after some time (around 30min) if the application does not start properly.
When the system enters the ready state, LED blinks slowly (1Hz).
To turn off the EYE+ Controller, unplug the power cable.
注釈
The power cable is provided in the EYE+ kit.
Power specifications
表 11 summarizes the EYE+ Controller power specifications.
Characteristic |
Value |
---|---|
Voltage |
24V DC PELV (+- 5%) |
Current Power |
12.5A max |
EYE+ connector is a male XLR3. Connector and cable specifications are presented in 表 12 and in 表 13.
Pin |
Signal |
EYE+ Controller connector |
---|---|---|
1 |
24V DC PELV |
|
2 |
GND |
|
3 |
EARTH |
Number |
Signal |
Internal wires |
EYE+ Controller connector |
---|---|---|---|
1 |
24V DC PELV |
Red |
|
2 |
GND |
Black |
|
3 |
EARTH |
Drain wire (black) 1 |
- 1
The drain wire has a smaller diameter than the GND wire.